Great
Lakes , Illinios  |
|
|
|
34.5kV Electrical
Reliability Improvements (Design/Build)
Great Lakes, Illinois
| Contract Number: |
N68950-01-C-0014 |
| Project Location: |
Naval Training Center
Great Lakes, Illinois |
| Project Owner: |
Department of the Navy |
| Point of Contact: |
Constance Danner, LTJG, Project Manager, or
Tom Bockman, Construction Representative |
Address: |
Engineering Field Activity, Midwest
201 Decatur Ave., Building 1A
Great Lakes, Illinois 60088 |
| Phone/Fax Number: |
(847) 688-4950 x426
(847) 688-2648 |
| Initial Contract Dollar Value: |
$4,142,600 |
| Final Contract Dollar Value: |
Project is currently 36% Complete |
| Period of Performance: |
February 2003 through October 10, 2004
(Scheduled Completion) |
|
Description
This project consisted of the provision of the following:
- Design and reconfiguring of new and existing 34.5kV Subtransmission
System
- Load Flow, Fault Analysis and Coordination Study
- Automatic Sectionalizing of 34.5kV Loop
- Construction of 4,800' of 34.5kV Concrete Encased Ductbank
- Provision of three (3) new 34.5kV Walk-in Environmentally
Conditioned Switchgears, including foundations
- Relay and SCADA Modifications to five (5) existing 34.5kV
Substations
- Provision of a Fiber Optic Network for Relay Communication
|
Performance
Evaluation
Overall Performance Evaluation: Not yet available, contract currently in progress. |
|