Great
Lakes, Illinois |
|
|
|
Hospital
Energy Center, Phases II and III
Great Lakes, Illinois
| Contract Number: |
N68950-02-C-0023 |
| Project Location: |
Naval Training Center
Great Lakes , Illinois |
| Project Owner: |
Department of the Navy |
| Point of Contact: |
Paul Oleson |
Address: |
Engineering Field Activity, Midwest
201 Decatur Ave. , Building 1A
Great Lakes , Illinois 60088 |
| Phone/Fax Number: |
(847) 688-4950 ext. 413
(847) 6888-2648 |
| Initial Contract Dollar Value: |
$4,473,400 |
| Final Contract Dollar Value: |
Project is currently 89% complete. |
| Period of Performance: |
September 25, 2002 through May 10, 2004 |
|
Description
This project consisted of the provision of the following:
- Provide new 6 Bay Line-Up 15kV Switchgear
- Provide new 3000A 480V LV Switchgear
- Provide two (2) 2000kVA Pad Mounted Transformers
- Provide Primary Concrete Encased Ductbanks
- Provide four (4) 750kVA Secondary Unit Substations
- Provide all new 600 Volt Service Entrance Feeders
- Provide all new 600 Volt Panelboard Feeders
- Provide three (3) 150' runs of Plug-in Bus Duct and 50
Plug-in Units
- Provide multiple Primary and Secondary Outages
- Provide replacement of 140 Panelboards
|
Comments
The project involved several major design changes. Feeders
and bus duct could not be installed where indicated. Two (2)
major switchboards were relocated to areas with adequate room
for installation. |
Performance
Evaluation
Overall Performance Evaluation: Not yet available, contract currently in progress. |
|